Noch Fragen? 0800 / 33 82 637

Shield Tunnel Cutter Replacement Technology

Produktform: Buch / Einband - flex.(Paperback)

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.weiterlesen

Sprache(n): Englisch

ISBN: 978-9811641091 / 978-9811641091 / 9789811641091

Verlag: Springer Singapore

Erscheinungsdatum: 22.08.2022

Seiten: 308

Auflage: 1

Autor(en): Jian Chen, Fanlu Min

106,99 € inkl. MwSt.
kostenloser Versand

lieferbar - Lieferzeit 10-15 Werktage

zurück