Time-To-Build
Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
Produktform: E-Buch Text Elektronisches Buch in proprietärem
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.weiterlesen
Dieser Artikel gehört zu den folgenden Serien
53,49 € inkl. MwSt.
Recommended Retail Price
kostenloser Versand
sofort lieferbar - Lieferzeit 1-3 Werktage
zurück